KERJA-KERJA PEMBAIKAN DAN PENGGANTIAN KOMPONEN ROSAK UNTUK SISTEM PAM AIR TAWAR PANGKALAN TLDM KD...
Day: May 28, 2024
REPLACEMENT WORKS OF ELECTRICAL INSTALLATION FOR FLOOD LIGHT SYSTEM AT FOOTBAL FIELD, KD SRI...
REPAIR AND MAINTENANCE WORKS FOR POOL WATER FILTERING AND CIRCULATION PUMPING SYSTEM AT POOL...
REAPIR WORKS FOR FIREFIGHTING SYSTEM AT WISMA LASKAR AND STORK BULK, KD SRI SEMPORNA...
SUPPLY AND INSTALL SPLIT AIR-CONDITIONING WORKS AT MAHKAMAH SYARIAH TAWAU – JKR/TWU/MEK/MAST/2024-02(F)
REPAIR AND ROUTINE WORKS FOR HIGH VOLTAGE AND LOW VOLTAGE SYSTEMS AT RUMAH PENCAWANG,...
KERJA-KERJA PEMBAIKAN DAN PENGGANTIAN KOMPONEN ROSAK UNTUK SISTEM SEWEAGE TREATMENT PLANT (STP) DI PANGKALAN...
REPAIR AND WATERJETTING WORKS FOR KD SRI SEMPORNA’S SEWERAGE TREATMENT TRANSFER PIPING ROUTES AND...
REPAIR WORKS FOR CENTRAL AIR-CONDITIONING SYSTEM FOR JKR TAWAU PHASE 1 – JKR/TWU/MEK/S37AC/2024-05(s)
SUPPLY AND INSTALL SPLIT AIR-CONDITIONING WORKS AT MAHKAMAH SYARIAH SEMPORNA – JKR/TWU/MEK/MASS/2024-03(F)
