PROPOSED TO CONSTRUCT 12M STEEL GIRDER CONCRETE DECK BRIDGE AT KAMPUNG BASINTI BELURAN(KM1.20)http://jkr.sabah.gov.my/wp-content/uploads/2024/09/JKR.BLN_.Q.2024S37.pdf
Month: September 2024
PROPOSED INSTALLATION OF SOLAR LED STREER LIGHT (CH 2.00 TO CH2.1), BELURAN, SABAH.http://jkr.sabah.gov.my/wp-content/uploads/2024/09/JKR.BLN_.Q.2024S36.pdf
PROPOSED CONCRETE PAVEMENT AT KM0.500 TO KM0.575 JALAN PAMOL CENDERAMATA, BELURAN http://jkr.sabah.gov.my/wp-content/uploads/2024/09/JKR.BLN_.Q.2024S35.pdf
PROJEK NAIKTARAF INSTITUT LATIHAN ISLAM (ILIM) KAMPUS LAHAD DATU, SABAH.
PENYENGGARAAN PAGAR BELAKANG JKR KOMPLEKS,KINABATANGAN DAN KERJA-KERJA YANG BERKAITAN
Proposed Pedestrian Walkway At KM0.70 Jalan Pantai Kg.Selamat – Kg.Mentelitip Near SK Siminul, Semporna, Sabah.http://jkr.sabah.gov.my/wp-content/uploads/2024/09/Notis-Sebutharga-Trafik-24-03-04.pdf
Proposed Pedestrian Walkway At KM0.15 Jalan Bukit Sakong Near SMK Bugaya, Semporna.http://jkr.sabah.gov.my/wp-content/uploads/2024/09/Notis-Sebutharga-Trafik-24-03-04.pdf
KERJA-KERJA PENYIASATAN TANAH BAGI PROJEK MENAIKTARAF JAMBATAN SG. BENGKOKA KM4.40, JALAN PINAPAK, PITAS, SABAH.
KERJA-KERJA PENYIASATAN TANAH UNTUK CADANGAN MEMBINA JAMBATAN SG. MENGALONG KM3.50 JALAN SIPITANG – TENOM...
KERJA-KERJA PENYIASATAN TANAH BAGI PROJEK PEMBAIKAN CERUN DI KM1.32 JALAN TAMPASAK LIWAN, TAMBUNAN (PANGGILAN...
