CONSTRUCTION OF RC DRAIN AT KM0.90 JALAN KEBU JKR.RNU/2025/ 30
Year: 2025
CONSTRUCTION OF RC RIGID PAVEMENT AT KM0.30 JALAN MARAKAU MURUK JKR.RNU/2025/29
DESILTING OF ROADSIDE EARTHDRAIN FROM KM5.0-KM7.0 JALAN SEDUL NARAWANG JKR.RNU/2025/ 28
DESILTING OF ROADSIDE EARTHDRAIN FROM KM0.0-KM3.218 JALAN LUTUT WALUHU JKR.RNU/2025/ 27
REGRADING OF GRAVEL ROAD FROM KM0.20-KM7.696 JALAN PERANCANGAN TAKUTAN JKR.RNU/2025/26
RECONSTRUCTION OF NEW ROAD ALIGMENT AT KM1.50 JALAN TAMBIAU SERAPONG
DESILTING OF ROADSIDE EARTHDRAIN FROM KM4.75-KM7.85 JALAN PERTANIAN MANTEKI JKR.RNU/2025/24 (S)
DESILTING OF ROADSIDE EARTHDRAIN FROM KM0.0-KM3.60 JALAN SEDUL NARAWANG JKR.RNU/2025/23 (S)
KERJA-KERJA PEMBAIKAN 3 UNIT RUMAH KERAJAAN DIVISYEN III DAN KERJA-KERJA BERKAITAN
REGRADING OF GRAVEL ROAD FROM KM 0.0-KM8.0 JALAN MIRURU MANGKADAIT JKR.RNU/2025/22 (S)
