Sebut Harga PROPOSED TO CONSTRUCT NEW LINE MAIN DRAINAGE SYSTEM AT JKR OFFICE COMPOUND A August 19, 2026 http://jkr.sabah.gov.my/wp-content/uploads/2026/08/JKR.BLN_.Q.2026S22.pdf About The Author JKR Beluran See author's posts Post Views: 156 Post navigation Previous Previous post: JADUAL PEMBUKAAN TENDER (JKR28) BAGI DAIF SABAH (2024) – PEMBINAAN SEMULA BANGUNAN DAIF DI SEKOLAH KEBANGSAAN TENAMBAK, KUALA PENYU, SABAH (XBA6327)Next Next post: PROPOSED MAINTENANCE DRAINAGE SYSTEM AT WORKSHOP BUILDING AT JKR BELURAN Related News Sebut Harga PROPOSED PEDESTRIAN WALKWAY AT KM58.30 JALAN BALUNG – SEMPORNA, SEMPORNA October 19, 2026 Sebut Harga PROPOSED PEDESTRIAN WALKWAY AT KM57.25 JALAN BALUNG – SEMPORNA, SEMPORNA October 19, 2026