KERJA-KERJA PEMBAIKAN SISTEM PENCEGAH KEBAKARAN DI BANGUNAN PENCAWANG 4 DAN 5 DI KD SRI...
JKR Kawasan Selatan
PENYEENGGARAAN TEMPAT LETAK KERETA BERBUMBUNG DAN KERJA-KERJA BERKAITAN DI BANGUNAN JKR TAWAU – JKR/TWU/BLD/2024/01(S)
ROUTINE AND MAINTENANCE WORKS FOR HIGH/LOW VOLTAGE MAIN SWITCH BOARD, ROLLER SHUTTER AND AUTO...
KERJA-KERJA PEMBAIKAN DAN PENGGANTIAN KOMPONEN ROSAK UNTUK SISTEM PAM AIR TAWAR PANGKALAN TLDM KD...
REPLACEMENT WORKS OF ELECTRICAL INSTALLATION FOR FLOOD LIGHT SYSTEM AT FOOTBAL FIELD, KD SRI...
REPAIR AND MAINTENANCE WORKS FOR POOL WATER FILTERING AND CIRCULATION PUMPING SYSTEM AT POOL...
REAPIR WORKS FOR FIREFIGHTING SYSTEM AT WISMA LASKAR AND STORK BULK, KD SRI SEMPORNA...
SUPPLY AND INSTALL SPLIT AIR-CONDITIONING WORKS AT MAHKAMAH SYARIAH TAWAU – JKR/TWU/MEK/MAST/2024-02(F)
REPAIR AND ROUTINE WORKS FOR HIGH VOLTAGE AND LOW VOLTAGE SYSTEMS AT RUMAH PENCAWANG,...
KERJA-KERJA PEMBAIKAN DAN PENGGANTIAN KOMPONEN ROSAK UNTUK SISTEM SEWEAGE TREATMENT PLANT (STP) DI PANGKALAN...
