TRAFFIC SIGNALS SYSTEM UPGRADE WORKS 2024 (SABAH WEST COAST NORTH ZONE) AT KK-SINDUMIN/MAT SALLEH...
Sebut Harga
SOIL INVESTIGATION WORKS FOR ’CADANGAN PEMBINAAN POS MANALUNAN, KINABATANGAN, SABAH’ (PANGGILAN SEMULA NO.1)
SOIL INVESTIGATION WORKS FOR ’CADANGAN PEMBINAAN PANGKALAN BOT RONDA BATALION 15 PGA DI SUNGAI...
KERJA-KERJA PENYIASATAN TANAH UNTUK PEMBINAAN KUARTERS KAKITANGAN DI PENJARA LAHAD DATU, SABAH (PANGGILAN SEMULA...
PROPOSED CONCRETE PAVEMENT FOR STEEP SECTION AT KM1.15 TO KM1.33 JALAN KG.BIRU, BELURANhttp://jkr.sabah.gov.my/wp-content/uploads/2024/09/JKR.BLN_.Q.2024S39.pdf
REGRAVELLING AND REGRADING OF ROAD PAVEMENT JALAN KG BASINTI, BELURAN(KM0.00-KM2.400)http://jkr.sabah.gov.my/wp-content/uploads/2024/09/JKR.BLN_.Q.2024S38.pdf
PROPOSED TO CONSTRUCT 12M STEEL GIRDER CONCRETE DECK BRIDGE AT KAMPUNG BASINTI BELURAN(KM1.20)http://jkr.sabah.gov.my/wp-content/uploads/2024/09/JKR.BLN_.Q.2024S37.pdf
PROPOSED INSTALLATION OF SOLAR LED STREER LIGHT (CH 2.00 TO CH2.1), BELURAN, SABAH.http://jkr.sabah.gov.my/wp-content/uploads/2024/09/JKR.BLN_.Q.2024S36.pdf
PROPOSED CONCRETE PAVEMENT AT KM0.500 TO KM0.575 JALAN PAMOL CENDERAMATA, BELURAN http://jkr.sabah.gov.my/wp-content/uploads/2024/09/JKR.BLN_.Q.2024S35.pdf
PENYENGGARAAN PAGAR BELAKANG JKR KOMPLEKS,KINABATANGAN DAN KERJA-KERJA YANG BERKAITAN
