Sebut Harga REGRAVELLING AND REGRADING OF ROAD PAVEMENT, DRAIN AND CULVERT CLEANING AND DESILTING WORKS AT JALAN KG.BANTUN, BELURAN (KM 3.00 TO KM4.82) August 12, 2025 http://jkr.sabah.gov.my/wp-content/uploads/2025/08/JKR.BLN_.Q.2025S18.pdf About The Author JKR Beluran See author's posts Post Views: 374 Post navigation Previous Previous post: Sambutan Gimik Pelancaran Hari Kebangsaan 2025 Peringkat JKR SipitangNext Next post: MAINTENANCE OF ROAD PAVEMENT BETWEEN KM2.50 TO 5.00 JALAN LAMA KK-SANDAKAN 2, BELURAN Related News Sebut Harga PROPOSED PEDESTRIAN WALKWAY AT KM58.30 JALAN BALUNG – SEMPORNA, SEMPORNA October 19, 2026 Sebut Harga PROPOSED PEDESTRIAN WALKWAY AT KM57.25 JALAN BALUNG – SEMPORNA, SEMPORNA October 19, 2026