REPAIR AND UPGRADING OF ELECTRICAL EXTRA LOW VOLTAGE WORKS – CCTV AND PABC SYSTEM...
Day: April 13, 2026
ELECTRICAL WORKS AND PREVENTIVE MAINTENANCE AT JKR PENAMPANG ROAD MAINTENANCE BUILDING – JKR/PNG/ELEC/26/03(S)
http://jkr.sabah.gov.my/wp-content/uploads/2026/04/JKR.BLN_.Q.2026S02.pdf
http://jkr.sabah.gov.my/wp-content/uploads/2026/04/JKR.BLN_.Q.2026S01-2.pdf
KERJA-KERJA PENYIASATAN TANAH BAGI CADANGAN MENAIKTARAF JAMBATAN SG. MENTAILANG KM 0.416, JALAN KALANG SIMPANGAN,...
KERJA-KERJA PENYIASATAN TANAH BAGI PROJEK PEMBINAAN JAMBATAN SG. PAMALAN DI KM12.8 JALAN KG. KENINGAU...
KERJA-KERJA PENYIASATAN TANAH BAGI PROJEK PEMBINAAN JAMBATAN KAIDUAN, KM0.5 JALAN BESUANG KAIDUAN, PAPAR
SOIL INVESTIGATION WORKS FOR ‘MENAIKTARAF JAMBATAN SG. MELALAP -1, KM0.788 JALAN PEKAN MELALAP, TENOM,...
PROPOSED GABION RETAINING WALL TO PROTECT EMBANKMENT AND CUT SLOPE FAILURE AT KM 5.77...
PROPOSED GABION RETAINING WALL AND ASSOCIATED WORKS TO PROTECT EMBANKMENT SLOPE FAILURE AT KM...
