http://jkr.sabah.gov.my/wp-content/uploads/2025/04/SEBUTHARGA.JKR_.BLN_.Q.2025S01.pdf
JKR Beluran
REGRAVELLING AND REGRADING OF ROAD PAVEMENT, DRAIN AND CULVERT CLEANING AND DESILTING WORKS AT...
PROPOSED NEW ROOFING SYSTEM FOR JKR BUILDING AT BELURAN AND OTHER ASSOCIATED WORKhttp://jkr.sabah.gov.my/wp-content/uploads/2024/10/JKR.BLN_.Q.2024S43.pdf
KERJA-KERJA NAIK TARAF SISTEM ELEKTRIK DAN PENDAWAIAN SEMULA DI SEKOLAH KEBANGSAAN JAMBONGAN, BELURAN.http://jkr.sabah.gov.my/wp-content/uploads/2024/10/JKR.BLN_.Q.2024-F42.pdf
PROPOSED MAINTENANCE OF SLAB FOR MINI OPEN HALL AT JKR BELURAN SND OTHER ASSOCIATED...
PROPOSED INSTALLATION OF SOLAR LED STREET LIGHT (CH 1.10 TO CH1.20),BELURAN ,SABAHhttp://jkr.sabah.gov.my/wp-content/uploads/2024/10/JKR.BLN_.Q-2024S-40.pdf
PROPOSED CONCRETE PAVEMENT FOR STEEP SECTION AT KM1.15 TO KM1.33 JALAN KG.BIRU, BELURANhttp://jkr.sabah.gov.my/wp-content/uploads/2024/09/JKR.BLN_.Q.2024S39.pdf
REGRAVELLING AND REGRADING OF ROAD PAVEMENT JALAN KG BASINTI, BELURAN(KM0.00-KM2.400)http://jkr.sabah.gov.my/wp-content/uploads/2024/09/JKR.BLN_.Q.2024S38.pdf
PROPOSED TO CONSTRUCT 12M STEEL GIRDER CONCRETE DECK BRIDGE AT KAMPUNG BASINTI BELURAN(KM1.20)http://jkr.sabah.gov.my/wp-content/uploads/2024/09/JKR.BLN_.Q.2024S37.pdf
PROPOSED INSTALLATION OF SOLAR LED STREER LIGHT (CH 2.00 TO CH2.1), BELURAN, SABAH.http://jkr.sabah.gov.my/wp-content/uploads/2024/09/JKR.BLN_.Q.2024S36.pdf
