PROPOSED CONCRETE PAVEMENT FOR STEEP SECTION AT KM1.15 TO KM1.33 JALAN KG.BIRU, BELURANhttp://jkr.sabah.gov.my/wp-content/uploads/2024/09/JKR.BLN_.Q.2024S39.pdf
JKR Beluran
REGRAVELLING AND REGRADING OF ROAD PAVEMENT JALAN KG BASINTI, BELURAN(KM0.00-KM2.400)http://jkr.sabah.gov.my/wp-content/uploads/2024/09/JKR.BLN_.Q.2024S38.pdf
PROPOSED TO CONSTRUCT 12M STEEL GIRDER CONCRETE DECK BRIDGE AT KAMPUNG BASINTI BELURAN(KM1.20)http://jkr.sabah.gov.my/wp-content/uploads/2024/09/JKR.BLN_.Q.2024S37.pdf
PROPOSED INSTALLATION OF SOLAR LED STREER LIGHT (CH 2.00 TO CH2.1), BELURAN, SABAH.http://jkr.sabah.gov.my/wp-content/uploads/2024/09/JKR.BLN_.Q.2024S36.pdf
PROPOSED CONCRETE PAVEMENT AT KM0.500 TO KM0.575 JALAN PAMOL CENDERAMATA, BELURAN http://jkr.sabah.gov.my/wp-content/uploads/2024/09/JKR.BLN_.Q.2024S35.pdf
(1st RECALL) KERJA-KERJA MEMBAIKI KUARTERS KERAJAAN DIV.4 UNIT 11347 DDAN KERJA-KERJA BERKAITAN PAITAN,BELURAN,SABAH http://jkr.sabah.gov.my/wp-content/uploads/2024/08/SEBUTHARGA-JKR.BLN_.Q2024S34.pdf
(1st RECALL) KERJA-KERJA MEMBAIKI KUARTERS KERAJAAN DIV.4 UNIT 11345 DAN UNIT 11346 SERTA KERJA-KERJA...
(1st RECALL) KERJA-KERJA MEMBAIKI KUARTERS KERAJAAN DIV 2 UNIT 11342 DAN DIV 3 UNIT...
REPLACEMENT OF STAINLESS STEEL WATER TANK AND OTHER ASSOCIATED WORK AT ARTISEN LINE JKR...
PROPOSED SUPPLY AND INSTALLATION OF ROAD SAFETY DEVICES ALONG JALAN MOYNOD KUALA SAPI, BELURAN,...
