UPGRADING ROADSIDE AND ASSOCIATED WORKS AT JALAN DAKATA (KM0.880–KM1.040), PENAMPANG. – JKR/PNG/PVT/26/38(S)
Sebut Harga EN
INSTALLATION OF SOLAR STREET LIGHT AT JLN KK-PENAMPANG-LOKKAWI. – JKR/PNG/SL/26/37(F)
INSTALLATION OF SOLAR STREET LIGHT AT JLN INOBONG. – JKR/PNG/SL/26/36(S)
INSTALLATION OF SOLAR STREET LIGHT AT JLN KOLOPIS. – JKR/PNG/SL/26/35(S)
Proposed construction of R.C pipe culvert 36″/900mm dia Class ‘X’/’L’, concrete drain, concrete pavement...
TRAFFIC SIGNALS SYSTEM MANAGEMENT (MAINTENANCE) 2026 – CKS MILLENIUM, ITCC, PLAZA 333, INOBONG AND...
TRAFFIC SIGNALS SYSTEM MANAGEMENT (MAINTENANCE) 2026 – BEVERLY AND SMK TUN FUAD JUNCTION. –...
REINSTATEMENT OF DAMAGED AND ASSOCIATED WORKS AT JALAN DATUK PETER MOJUNTIN (KM1.270 – KM1.600),...
JUNCTION IMPROVEMENT AT JALAN PUKAKON POMONTODON PH 1 / JALAN KOTA KINABALU-KENINGAU-TENOM. – JKR/PNG/TS/26/31(F)
PEDESTRIAN WALKAWAY FACILITIES NEAR AT SK BABAGON ALONG JALAN TAMPASAK PENAMPANG. – JKR/PNG/TS/26/30(S)
