SOIL INVESTIGATION WORKS FOR ’PEMBINAAN PUSAT PEMULIHAN PENAGIHAN NARKOTIK (PUSPEN) DAN PUSAT TAHANAN REMAN...
PROPOSED REGRADING, REGRAVELLING & DESILTING WORKS BETWEEN KM0.00 TO KM5.00 JALAN GADING, LAHAD DATU,...
Proposed construction of Twin R.C pipe culvert 721800mm dia Class ‘Z”H’, maintenance road pavement...
PROPOSED ELECTRICAL MAINTENANCE WORKS FOR STREET LIGHTING SYSTEM AT JALAN RANAU-TELUPID (FASA 2)(SECTION 3)...
PROPOSED ELECTRICAL MAINTAINANCE WORKS FOR STREET LIGHT SYSTEM AT JALAN RANAU-TELUPID (PHASE 1)(BULATAN PEKAN...
REGRAVELLING AND REGRADING OF ROAD PAVEMENT, DRAIN AND CULVERT CLEANING AND DESILTING WORKS AT...
PROPOSED NEW ROOFING SYSTEM FOR JKR BUILDING AT BELURAN AND OTHER ASSOCIATED WORKhttp://jkr.sabah.gov.my/wp-content/uploads/2024/10/JKR.BLN_.Q.2024S43.pdf
KERJA-KERJA NAIK TARAF SISTEM ELEKTRIK DAN PENDAWAIAN SEMULA DI SEKOLAH KEBANGSAAN JAMBONGAN, BELURAN.http://jkr.sabah.gov.my/wp-content/uploads/2024/10/JKR.BLN_.Q.2024-F42.pdf
KOTA KINABALU, 04 OKT – Menteri Kerja Raya Malaysia, Dato Sri Alexander Nanta Linggi...
KOTA KINABALU, 04 OKT – Menteri Kerja Raya, Dato Sri Alexander Nanta Linggi telah...
